General Studies · Drilling Operations
In a drilling operation, why is the workpiece lifted and secured on parallel blocks inside a vice?
- 1To provide clearance between the workpiece and the bottom of the vice✓
- 2To transmit higher power to the workpiece
- 3To introduce a bending force on the workpiece
- 4To ensure a better gripping surface on the drill bit
Correct answer
To provide clearance between the workpiece and the bottom of the vice
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for General Studies?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Drilling Operations?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in General Studies · Drilling Operations