In 2026, the Rawatbhata nuclear site in Rajasthan reached a major milestone with the operationalization of two new indigenous Pressurized Heavy Water Reactors (RAPP-7 and RAPP-8). What is the installed generation capacity of each of these newly active reactors?
- 1800 MW
- 2700 MW✓
- 3600 MW
- 4500 MW
Correct answer
700 MW