If the pessimistic estimate of a project is Rs. 12 Cr, the optimistic is Rs. 9 Cr, and the most likely estimate is Rs. 10 Cr, then the expected value (Rs. in Cr) using PERT would be:
- 112.00
- 211.42
- 310.00
- 410.17✓
Correct answer
10.17