Computer · Estimation and Costing
For a 2.5 cubic meter cement concrete (1 : 2 : 4) damp-proof-course, the quantity of stone chips required will be:
- 12.7 m3
- 22.5 m3
- 32.2 m3✓
- 42.0 m3
Correct answer
2.2 m3
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Estimation and Costing?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions