Mathematics · Estimation and Costing
Find the dry volume of concrete required for 200 m2 of 20 cm thick concrete work with a proportion of 1 : 2 : 4.
- 176.4 m3
- 280 m3
- 354.3 m3
- 461.6 m3✓
Correct answer
61.6 m3