Computer · Irrigation Engineering
Examine the two statements carefully and select the correct option: Statement (I): A cross drainage structure, aqueduct, is constructed to negotiate an aligned channel over, below, or at the same level of a stream. Statement (II): An aqueduct is constructed when the full supply level (FSL) of the canal is much higher than the high flood level (HFL) of a stream.
- 1Both Statement (I) and Statement (II) are individually true and Statement (II) is the correct explanation of Statement (I)
- 2Both Statement (I) and Statement (II) are individually true but Statement (II) is not the correct explanation of Statement (I)
- 3Statement (I) is true but Statement (II) is false
- 4Statement (I) is false but Statement (II) is true✓
Correct answer
Statement (I) is false but Statement (II) is true
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Irrigation Engineering?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer · Irrigation Engineering