Mathematics · Estimation and Costing
Estimate the total rate of metal at the site per cubic meter if its rate at the source is ₹800 per cubic meter (including loading and unloading) and the lead distance is 35 km at a conveyance rate of ₹20 per km per cubic meter.
- 1₹2,000
- 2₹1,500✓
- 3₹700
- 4₹800
Correct answer
₹1,500