Current Affairs · Indian Railways Infrastructure in Bihar
Consider the following statements regarding the infrastructural upgrades implemented by Indian Railways in Bihar since 2014: I. Indian Railways has completed the construction of 624 km of new lines and 739 km of multi-tracking. II. The infrastructural upgrades include 1,927 km of gauge conversion and electrification work. III. A total of 115 new trains were introduced, and various stations were upgraded with over 300 pairs of trains. Which of the statements given above is/are correct?
- 1Only I and II
- 2Only II and III
- 3Only I and III✓
- 4I, II, and III
Correct answer
Only I and III
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Current Affairs?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Indian Railways Infrastructure in Bihar?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Current Affairs · Indian Railways Infrastructure in Bihar