Consider the following statements about the Sawalkote Hydroelectric Project: I. The project is located on the Jhelum River in Jammu and Kashmir. II. It is designed as a storage-based hydropower project. III. The project received a fresh environmental clearance from the Ministry of Environment, Forest and Climate Change (MoEFCC). IV. The project will be implemented by the National Hydroelectric Power Corporation (NHPC). How many of the above statements are NOT correct?
- 1All four
- 2Only three
- 3Only two✓
- 4Only one
Correct answer
Only two
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Current Affairs?
Practice full-length Current Affairs mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Infrastructure Projects?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Current Affairs · Infrastructure Projects