Mathematics · Mensuration
Calculate the volume of cement concrete work required for a 2 km long, 4 m wide, and 10 cm thick cement concrete road layer.
- 18000 m 3
- 2320 m 3
- 3400 m 3
- 4800 m 3✓
Correct answer
800 m 3
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Mathematics?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Mensuration?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Mathematics · Mensuration