Calculate the figures that should be entered into Gap 1, Gap 2, and Gap 3 (to the nearest whole kg):
- 1(i) Steel required for production = 220 × 1.5 kg + 170 × 2 kg = 670 kg (ii) Opening inventory = (220 × 1.5 kg + 170 × 2 kg) × 0.5 = 335 kg (iii) Closing inventory = (240 × 1.5 kg + 180 × 2 kg) × 0.5 = 360 kg✓
- 2(i) Steel required for production = 220 × 1.5 kg + 170 × 2 kg = 780 kg (ii) Opening inventory = (220 × 1.5 kg + 170 × 2 kg) × 0.5 = 455 kg (iii) Closing inventory = (240 × 1.5 kg + 180 × 2 kg) × 0.5 = 270 kg
- 3(i) Steel required for production = 220 × 1.5 kg + 170 × 2 kg = 770 kg (ii) Opening inventory = (220 × 1.5 kg + 170 × 2 kg) × 0.5 = 445 kg (iii) Closing inventory = (240 × 1.5 kg + 180 × 2 kg) × 0.5 = 220 kg
- 4(i) Steel required for production = 220 × 1.5 kg + 170 × 2 kg = 770 kg (ii) Opening inventory = (220 × 1.5 kg + 170 × 2 kg) × 0.5 = 435 kg (iii) Closing inventory = (240 × 1.5 kg + 180 × 2 kg) × 0.5 = 260 kg
Correct answer
(i) Steel required for production = 220 × 1.5 kg + 170 × 2 kg = 670 kg (ii) Opening inventory = (220 × 1.5 kg + 170 × 2 kg) × 0.5 = 335 kg (iii) Closing inventory = (240 × 1.5 kg + 180 × 2 kg) × 0.5 = 360 kg
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Mathematics?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Cost Accounting & Budgeting?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Mathematics · Cost Accounting & Budgeting