Computer · Building Construction
Before plastering a new masonry surface, it should be cleaned and kept damp primarily to achieve which of the following?
- 1Proper curing of structural masonry
- 2Base for mechanical keying
- 3Optimum suction to prevent rapid loss of water from mortar✓
- 4Base for surface hacking
Correct answer
Optimum suction to prevent rapid loss of water from mortar
Download Single Question PDF