As per IRC specifications, the maximum spacing of contraction joints in unreinforced cement concrete (CC) slabs of thickness 20 cm is ______.
- 17.0 m
- 23.0 m
- 34.5 m✓
- 45.5 m
Correct answer
4.5 m