Computer · Formwork
As per Indian Standards, the formwork (props left under) for slabs spanning up to 4.5 meters should generally not be removed before:
- 121 days
- 214 days✓
- 37 days
- 43 days
Correct answer
14 days
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Formwork?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer · Formwork