Arrange the initial steps for the construction of a swimming pool in the correct chronological sequence: (a) Get a permit (b) Excavate the area (c) Design the pool (d) Grade the ground Choose the correct option:
- 1(c), (b), (d), (a)
- 2(a), (b), (c), (d)
- 3(d), (c), (a), (b)
- 4(c), (a), (b), (d)✓
Correct answer
(c), (a), (b), (d)