Geography · Energy Infrastructure
Arrange the following thermal power stations of Uttar Pradesh in chronological order based on their initial commissioning dates (oldest first): A) Harduaganj Thermal Power Station B) Obra Thermal Power Station C) Unchahar Thermal Power Station D) Parichha Thermal Power Station
- 1B-D-A-C
- 2A-D-B-C
- 3A-C-B-D
- 4A-B-D-C✓
Correct answer
A-B-D-C
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Geography?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Energy Infrastructure?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Geography · Energy Infrastructure