Arrange the following steps in a typical binary cycle geothermal power generation plant in the correct sequential order: 1. Extraction of geothermal fluid from production well2. Heat exchange between geothermal fluid and secondary working fluid3. Turbine rotation driven by expanded vaporized working fluid4. Re-injection of cooled geothermal fluid back into the ground
- 11 – 2 – 3 – 4✓
- 21 – 3 – 2 – 4
- 32 – 1 – 3 – 4
- 43 – 1 – 2 – 4
Correct answer
1 – 2 – 3 – 4
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Environment & Ecology?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Environment?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Environment & Ecology · Environment