General Studies · Controlling
Arrange the following stages of management response to a production error in the correct chronological sequence as per the organizational framework: A. Taking necessary corrective action B. Identifying the specific error in the process C. Comparing the production output to the planned standard D. Measuring the actual production output Choose the correct answer from the options given below:
- 1A, B, C, D
- 2C, D, A, B
- 3D, C, B, A✓
- 4B, C, D, A
Correct answer
D, C, B, A
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for General Studies?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Controlling?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in General Studies · Controlling