Arrange the following operations of Production Planning and Control (PPC) in the correct sequential order: (i) Routing (ii) Dispatching (iii) Follow up (iv) Scheduling
- 1(ii), (iv), (iii), (i)
- 2(ii), (iv), (i), (iii)
- 3(iv), (i), (iii), (ii)
- 4(i), (iv), (ii), (iii)✓
Correct answer
(i), (iv), (ii), (iii)