Science and Technology · General Engineering
Arrange the following operational sequences of needle actions in the exact chronological order required for the structural formation of a tuck stitch. I. The accumulated yarns are finally cast off the needle and knitted to complete the sequence. II. The needle simultaneously retains its former loop, resulting in two loops being held together in the same needle hook. III. The dual holding action of the accumulated loops may be repeated several times as necessary. IV. A needle initially receives a new yarn in order to form a second loop. Choose the correct answer from the options given below:
- 1II, III, IV, I
- 2IV, II, III, I✓
- 3II, IV, III, I
- 4IV, III, II, I
Correct answer
IV, II, III, I
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Science and Technology?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on General Engineering?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Science and Technology · General Engineering