Home Science · Apparel Construction
Arrange the following events in the correct chronological sequence of the take-up lever's mechanical action during a single stitch cycle: A. Upward movement of the take-up lever B. Downward movement of the take-up lever C. Pulling back of extra thread to tighten the stitch D. Supply of slack thread to the needle Choose the correct answer from the options given below:
- 1B, A, D, C
- 2D, B, C, A
- 3B, D, A, C✓
- 4A, C, B, D
Correct answer
B, D, A, C
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Home Science?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Apparel Construction?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Home Science · Apparel Construction