Mathematics · Operations Management
An Indian technology firm is using Lean principles for its software development process. The management is analyzing the cost reduction achieved versus the cost reduction planned for a new project, Project Orion, using Kaizen Costing. Statement 1: If the Planned Cost Reduction for Project Orion was 4,00,000 rupees, and the Actual Cost Reduction achieved was 5,00,000 rupees, the result is a Favorable Kaizen Variance of 1,00,000 rupees, indicating successful continuous improvement. Statement 2: The cost baseline for the Target Cost Reduction in Kaizen Costing is typically the Target Cost established in the design phase, and it is a fixed, non-changing benchmark. Statement 3: Kaizen Costing is primarily focused on process cost reduction and generally excludes costs related to marketing or research and development (R and D). Statement 4: The ultimate success of Kaizen Costing is measured not only by the cost reduction achieved but also by the sustained improvement in the key performance indicators (KPIs) like defect rates and lead time. Which of the above statements is/are correct?
- 1Statement 1 and 4 only
- 2Statement 1, 3, and 4 only✓
- 3Statement 2 and 3 only
- 4Statement 1 and 2 only
Correct answer
Statement 1, 3, and 4 only
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Mathematics?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Operations Management?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Mathematics · Operations Management