An estimate prepared when the original sanctioned estimate is likely to be exceeded by more than 5% due to price escalation or change in specifications without major change in structural design is called a:
- 1Rough cost estimate
- 2Supplementary estimate
- 3Revised estimate✓
- 4Detailed estimate
Correct answer
Revised estimate