Geography · Energy Infrastructure
Among the following, one of the earliest colonial-era small-scale canal drop hydroelectric installations in undivided Uttar Pradesh was established in 1931 on the Upper Ganga Canal at which location?
- 1Matatila
- 2Sumera (Aligarh)✓
- 3Chilla
- 4Rihand
Correct answer
Sumera (Aligarh)