Physics · Concrete Technology
According to standard specifications (such as IS 456), the soffit formwork to slabs (with props to be refixed immediately) for spans up to 4.5 m can be removed after:
- 114 days
- 27 days
- 33 days✓
- 41 day
Correct answer
3 days