Computer · Irrigation Engineering
A solid structure constructed across a river raised to raise the water level, where the ponding of water is achieved primarily by the raised crest rather than shutters, is known as a:
- 1Weir✓
- 2Barrage
- 3Fish ladder
- 4Divide wall
Correct answer
Weir
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Irrigation Engineering?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer · Irrigation Engineering