Computer · Construction Management and Equipment
A mechanized construction site has planned to make use of tower cranes for the transport of materials and components. The locality has a 220 kV overhead power line passing through it. According to IS 8969:1978, as a precautionary measure of safety, the minimum vertical clearance of any member of the crane with respect to the overhead power line shall be:
- 12.5 m
- 25.7 m✓
- 33.6 m
- 46.5 m
Correct answer
5.7 m
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Construction Management and Equipment?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer · Construction Management and Equipment