Electrical Engineering · Power Systems
A generating station has a maximum demand of 25 MW, a load factor of 50%, and a plant capacity factor of 40%. The reserve capacity of the plant is:
- 112.50 MW
- 21.00 MW
- 36.00 MW
- 46.25 MW✓
Correct answer
6.25 MW