Computer · Irrigation Engineering
A cross-drainage work where an irrigation canal is taken over a natural drainage stream because the bed level of the canal is higher than the high flood level of the drainage stream is called a/an:
- 1Level crossing
- 2Siphon aqueduct
- 3Super passage
- 4Aqueduct✓
Correct answer
Aqueduct