Accounting · Contract Accounts
A construction contractor is preparing a Contract Account for an incomplete long-term project. Assess the following statements: I. The cost of a dedicated plant purchased for the contract is debited to the Contract Account and is depreciated annually, with the depreciated value forming part of the closing WIP at year-end. II. Abnormal Loss of materials is debited to the Contract Account at cost and then credited at the cost less scrap value, with the net loss being debited to the Costing P&L Account. III. The value of Work Uncertified is included in the closing WIP at its cost to the contractor and is not included in the profit recognition calculation. Which of the statements given above are correct?
- 1I and III are correct, II is incorrect.
- 2II and III are correct, I is incorrect.
- 3I, II, and III are all correct.✓
- 4I and II are correct, III is incorrect.
Correct answer
I, II, and III are all correct.
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Accounting?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Contract Accounts?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Accounting · Contract Accounts