Physics · Soil Mechanics
A clay layer 10 m thick in the field takes 400 days to attain 50% consolidation under the condition of double drainage. If the same clay layer is underlain by a hard rock (single drainage condition), what is the time taken to attain 50% consolidation?
- 1200 days
- 21600 days✓
- 3800 days
- 4100 days
Correct answer
1600 days
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Physics?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Soil Mechanics?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Physics · Soil Mechanics