A certain work can be done by A and B together in 6 days, and by B and C together in 12 days. If C alone can do the same work in 36 days, then how long will it take to finish the work if A, B, and C work together?
- 117 days✓
- 227 days
- 337 days
- 447 days
Correct answer
17 days