A and B together can do a piece of work in 40 days. B and C together can do it in 25 days. A worked at it for 6 days and then B worked for 8 days. After B left, C joined and completed the remaining work in 79 days. In how many days can C alone complete the entire work?
- 1100 days✓
- 280 days
- 370 days
- 4120 days
Correct answer
100 days