A and B can do a piece of work in 28 days; B and C can do the same work in 18 days and A, B, and C together can do it in 16 days. The time required (in days) to finish the work by A and C together is:
- 127 1319
- 223 1115
- 325 1113
- 429 1117✓
Correct answer
29 1117